Potain Crane Rental: Questions People Actually Ask Before Signing
-
1. Can I rent a Potain MDLT 1109 crane on short notice?
-
2. What do I need to know about the Potain HDT80 tower crane in Utah?
-
3. Why would a rental include a Shelby truck?
-
4. What is a "bob crane" and do I need one for a Potain setup?
-
5. How do I get forklift certified for crane site work?
-
6. What's the biggest hidden cost in an emergency crane rental?
-
7. How far in advance should I call for a Potain rental?
-
1. Can I rent a Potain MDLT 1109 crane on short notice?
Potain Crane Rental: Questions People Actually Ask Before Signing
I work in crane logistics, and I've dealt with more than 200 rush orders in the past 5 years. When a project manager calls me at 4 p.m. on a Friday needing a Potain MDLT 1109 crane for rent by Monday, the conversation is never about which tower crane is "best." It's about what's available, what it will cost, and what could go wrong. (note to self: if the client mentions Shelby truck, I automatically ask about transportation hours.)
Here are the questions that matter, answered honestly—not the sales version.
1. Can I rent a Potain MDLT 1109 crane on short notice?
Yes, but "short notice" usually means you're limited to wherever the owner has a unit sitting. We had a client in March 2024 needing an MDLT 1109 with luffing jib for a hotel project; the unit was in Nevada, not Utah, and the owner quoted a $7,000 move fee. Was that fair? It covered transport and permits. The lesson: ask about relocation costs before you fall in love with the day rate.
What I mean is that the "cheapest" rental isn't a number on a brochure—it's the day rate plus delivery, assembly, weather-related standby, and teardown. Which brings me to the next question…
2. What do I need to know about the Potain HDT80 tower crane in Utah?
Short answer: altitude and wind. The HDT80 is a solid crane for mid-rise work, but Utah's high desert sites get intense wind. I'd build a 20% margin into the permissible wind speed and check whether the rental company's climate package includes cold-weather start inhibitors. In January 2024, we had a crane in the Wasatch Range stop at -15°F because the hydraulic oil wasn't winter-grade.
Does this mean the HDT80 won't work? Not at all. But a responsible contractor will ask for the site-specific engineering letter before signing. (Real talk: if the vendor won't provide one, that's a red flag.)
3. Why would a rental include a Shelby truck?
Because tower cranes aren't delivered by a single flatbed. The mast sections, slewing unit, and counterweights require multiple loads, and in my experience, a Shelby truck (or any heavy-duty haul truck) is the workhorse that delivers the heaviest pieces.
One thing I've learned to ask: "Is the trucking quote inclusive of offloading?" Once, we assumed the driver would crane off the sections. He didn't. We rented a mobile crane for $800 to unload. That's what I mean by total cost thinking—look, I'm not saying you need the most expensive haul plan. I'm saying ask what "delivered" actually includes.
4. What is a "bob crane" and do I need one for a Potain setup?
There's no industry standard for the term. Some people use it for a mini crawler crane or a knuckle-boom crane; others might be thinking of a Bobcat with a lifting attachment. If your search for "bob crane" landed you here, you're likely looking for a compact crane to help assemble the tower crane.
Do you need one? Only if your largest component (often the slewing unit, weighing 8-12 tons) exceeds your site crane's capacity. Last year, we had a 10.5-ton section that a 12-ton mobile crane couldn't place safely at radius. We ended up using a 20-ton with a jib. (which, honestly, added a day to the schedule). Ask your crane provider for a lift plan—don't guess.
5. How do I get forklift certified for crane site work?
This question comes up more than you'd think, because a tower crane site often needs a forklift to move loads. Forklift certification isn't a card you buy online. According to OSHA (osha.gov), employers must provide formal instruction, behind-the-wheel training, and an evaluation of the operator—and evaluators must be certified. The card is only valid at that employer, though many issuers (community colleges, union halls) offer portable certificates.
In January 2025, community college courses in Salt Lake City cost $175–$275 for a two-day class (verify current pricing). Take the class, get the cert, and then let your employer do the required three-year evaluation—otherwise you're still technically uncertified on their site.
6. What's the biggest hidden cost in an emergency crane rental?
Time-related surcharges. The base rate might be $800/day, but the contract's "overtime" rate after 8 hours and weekend multipliers can double it. In December 2023, a client avoided a $1,500 freight fee by using their own truck—then paid $4,200 in standby fees because the crane was stuck on site for three days waiting for the crew. So glad I asked about weather contingencies before that one.
Here's my rule: request a written itemized quote with setup, fuel, travel, offloading, and weather clause. A vendor who lists all fees upfront—even if the total looks higher—usually costs less in the end.
7. How far in advance should I call for a Potain rental?
Months if possible, because mobilization is the bottleneck. But if you're in a bind, a call at 8 a.m. can have a crane on its way by noon—if the vendor has one within 200 miles and a trucking company with open slots. The emergency rental is always possible, it might cost 15-30% more (based on my recent quotes; verify current rates). I've seen the price range hold steady even during the construction season.
I'd rather see a client call me early with a cancelable reservation than call me late with a schedule crisis. Roughly speaking, an early call will always give you more leverage. Don't hold me to this, but the peace of mind alone is worth the $200 holding fee.
(mental note: never skip the redundancy checklist again. The HDT80 incident in January 2024 changed how I think about backup planning—one broken transport truck, and suddenly a 20% time buffer didn't seem so wasteful.)